Manufacturing

 

Machine Shop

Machine Shop

• Size: 195,000 Sq. Ft./18,000 m²
• 3 Large Drilling Machines for components up to 5 t
• 9 Machining Centers
• Annual Capacity:
  190,000 Production Hours

Welding Shop

Welding Shop

• Size: 12,000 Sq. Ft./1,100 m²
• 2 Sub-Arc-Welding Machines for components up to 7t
• 2 Plasma-Arc Welding Machines
• 1 Orbital-Welding Machine
• 1 Welding Robot for Hard-Facing
• 5 Manual Welding Stations (GMAW, GTAW, SMAW)
• 7 Furnaces (gas- and electric fired furnaces, shaft furnaces)
• Annual Capacity:
  23,000 Working Hours

Assembly

Assembly

• Size:
  Assembly: 8,800 Sq. Ft./816 m²
  Clean Condition Room: 2,300 Sq. Ft./216 m²
• Test Facility: up to a nominal size of 1.2 m and an
  overall length of 3 m valves are pressure and
  tightness tested before leaving the factory
• Annual Capacity:
  20,000 Valves